Moss Farm

Transforming a low-value former landfill into a productive clean energy asset

Formby, Cheshire

Status: Planning Approved

  • 22.4MWp solar project with planning consent secured in August 2025 — powering the transition to clean energy at scale.

  • 63% delivered on a former landfill site, using a ballasted, no ground-penetration system — turning legacy land into a source of renewable power.

  • Species-rich meadow planting and managed grazing embedded within the design, enhancing biodiversity while preserving the land’s agricultural value.

  • Integrated water management and thoughtful field design, reducing runoff, improving drainage and protecting long-term land condition